Method of construction.

The length of the waste weir should be sufficient to discharge 4" of rain, falling on the gathering ground which contributes directly to the reservoir, plus the maximum quantity of water that the catch-water channel can convey. The latter should be provided with overflows, at points where it crosses natural drainage channels.

(10) The draw-off arrangements are satisfactory in principle. Some minor alterations in detail seem desirable. It is hardly necessary to go into this question at present, for the outlet apparatus will not be required for some time to come.

(11) It is worthy of consideration whether the sectional area of the outlet-culvert might not be increased with advantage so as to provide water way for the passage of rain-water during moderate floods.

If, during a great flood the unfinished dam is overtopped, no great damage will result. This is one of the great merits of masonry as against earth. An earth dam, if overtopped, would be destroyed.

(14) I recommend that the dam be constructed departmentally, and not by contract, so as to ensure perfect workmanship, an arrangement adopted by Mr. Mansergh, President Inst. C.E., in the case of the dams for the Birmingham water-works. Competent European foremen or inspectors must supervise the work continuously. At any rate, most careful supervision will be required. All cement should be provided by the Government.

Edit History

2026-06-01 04:23:14 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
IA AY 16 1. NE AVO Bari 9970 #id. ed t J y I 411 : : A %. Cow ettoy A N-93 TAN wnd 1 taf " A - I A Juvel C Outlet Pa da Culvert. 『་ -. T {.. j 2 PAR-15 Kw arid so (9) P 21% 46 + 199 raw off rrangements. Method of construction. The length of the waste weir should be sufficient to discharge 4" of rain, falling on the gathering ground which contributes directly to the reservoir, plus the maximum quantity of water that the catch-water channel can convey. The latter should be provided with overflows, at points where it crosses natural drainage channels. (10) The draw-off arrangements are satisfactory in principle. Some minor alterations in detail seem desirable. It is hardly necessary to go into this question at present, for the outlet apparatus will not be required for some time to come. (11) It is worthy of consideration whether the sectional area of the outlet-culvert might not be increased with advantage so as to provide water way for the passage of rain-water during moderate floods. If, during a great flood the unfinished dam is overtopped, no great damage will result. This is one of the great merits of masonry as against earth. An earth dam, if overtopped, would be destroyed. (14) I recommend that the dam be constructed departmentally, and not by contract, so as to ensure perfect workmanship, an arrangement adopted by Mr. Mansergh, President Inst. C.E., in the case of the dams for the Birmingham water-works. Competent European foremen or inspectors must supervise the work continuously. At any rate, most careful supervision will be required. All cement should be provided by the Government.
Baseline (Original)
IA AY 16 1. NE AVO Bari 9970 #id. ed t J y I 411 : : A %. Cow ettoy A N-93 TAN wnd ་་ཎྜཱཉྩ 1 taf " A - I A Juvel C Outlet Pa da Culvert. 『་ -. T {.. j 2 PAR-15 Kw arid so (9) P 21% 46 + 199 raw off rrangements. Method of construction. The length of the waste weir should be sufficient to discharge 4" of rain, falling on the gathering ground which contributes directly to the reservoir, plus the maximum quantity of water that the catch-water channel can convey. The latter should be provided with overflows, at points where it crosses natural drainage chamels. (10) The draw-off arrangements are satisfactory in principle. Some minor alterations in detail seem de- sirable. It is hardly necessary to go into this question at present, for the outlet apparatus will not be required, for some time to come. (11) It is worthy of consideration whether the sectional area of the outlet-culvert might not be in- creased with advantage so as to provide water way for the If, during passage of rain-water during moderate floods. a great flood the unfinished dam is overtopped, no great damage will result. This is one of the great merits An earth dam, if overtopped. of masonry as against earth. would be destroyed. (14) I recommend that the dam be constructed depart- mentally, and not by contract, so as to ensure perfect work- Past manship, an arrangement adopted by Mr. Mansergh, President Inst. C.D. in the case of the dams for the Birmingham water-works, vision will be required. Competent European foremen or inspectors must supervise the work continuously. At any rate, most careful super- All cement should be provided by the Government. 4
2026-06-01 04:23:14 · Baseline
View content

IA AY

16

1.

NE

AVO Bari

9970

#id.

ed t

J

y

I

411

:

:

A

%. Cow

ettoy

A

N-93 TAN wnd ་་ཎྜཱཉྩ

1

taf

"

A

-

I A

Juvel

C

Outlet Pa da Culvert.

『་ -. T

{..

j 2

PAR-15 Kw arid so

(9)

P

21%

46

+

199

raw off rrangements.

Method of construction.

The length of the waste weir should be sufficient to discharge 4" of rain, falling on the gathering ground which contributes directly to the reservoir, plus the maximum quantity of water that the catch-water channel can convey. The latter should be provided with overflows, at points

where it crosses natural drainage chamels.

(10) The draw-off arrangements are satisfactory in principle. Some minor alterations in detail seem de- sirable. It is hardly necessary to go into this question at present, for the outlet apparatus will not be required,

for some time to come.

(11) It is worthy of consideration whether the sectional area of the outlet-culvert might not be in- creased with advantage so as to provide water way for the

If, during passage of rain-water during moderate floods.

a great flood the unfinished dam is overtopped, no great damage will result. This is one of the great merits

An earth dam, if overtopped. of masonry as against earth.

would be destroyed.

(14) I recommend that the dam be constructed depart- mentally, and not by contract, so as to ensure perfect work-

Past manship, an arrangement adopted by Mr. Mansergh, President Inst. C.D. in the case of the dams for the

Birmingham water-works, vision will be required. Competent European foremen or inspectors must supervise the work continuously.

At any rate, most careful super-

All cement should be provided by the Government.